Sekhar Babu Talari
Planning Engineer
Saudi Arabia
Message
Connect
Profile:
Summary
- Dynamic Engineering professional with 11+ years’ experience including Aerospace & Automobile Industry as an Industrial Engineer, Integrated Master Scheduler & Production Planner who Competent in Industrial Engineering activities, Planning, Scheduling and Execution of new programs and ensuring the desired outcome. Hands on working experience on the systems like MTM-MOST (Maynard Operation Sequence Technique), MTM-UAS, MDAT, MS project, Primavera & Lean Manufacturing.
Experience
2016
Aug
-
Present
Planner
Alsalam Aerospace Industries / Riyadh
- Preparation of detail work scope of Wings and Fuselage for F-15 Eagle
- Preparation of complete scope of the project in detail
- Calculation of estimated man hours and analysis to fit the business case
- Preparation of Integrated master schedule (IMS) as per customer demand
- Define the activities, duration and preparation of complete deliverable
- Resource analysis and budget calculation
- Capacity study and analysis of 3M (Man, Machine and Material)
- Learning curve analysis , calculation of CPI & SPI (Cost and Schedule Performance Indexes)
- Crew Load / Swim lane charts & recovery schedule
- Ensure that all services are conducted in a safe, cost effective and environmentally sound manner, and fully meet all company and additional project specific requirements
- Baseline creation and track the actual performance against baseline and review the variance
- Execution, monitoring and tracking the product and update the project status for top management
- Tracking the material shortages, coordinating with the procurement team
- Preparation of inspection plans (internal as well as Customer and DCMA)
- variance analysis and report generation
- Calculation of VA & NVA to improve the productivity by reducing the NVA
- Assist with the co-ordination of necessary input from all departments and project team
- initiation, implementation of 5S culture
- Working on lean manufacturing concepts to reduce the NVA and improve the productivity.
Key projects/achievements
- Preparation and buy off the Master Schedule to customer as per the demand & sign off
- Initiated the kitting process to reduce the unnecessary movements/waiting time of the technicians
- Reduced skinning station duration from 170 to 70 days by utilizing the technicians,kitting, lean method and 5S
- Produced from 8 wings to 14 wings after implementing the kitting and lean methodology
- Manpower reduction/ saving done by 33.3%
- Validation of learning curves and proposal and preparation of multi station working mechanics in the factory
2014
Apr
-
2016
Apr
Deputy Manager
Tata Advanced Systems Limited
2011
Dec
-
2014
Mar
Assistant Manager
Tata Lockheed Martin Aero Structures Limited
- Planning, scheduling, and Industrialization for the below programs
C-130J Super Hercules: Center wing box, Horizontal, Vertical stabilizer and leading edges
DO-228 NG (RUAG: Forward fuselage Wings and Leading edges
Pilatus PC-12 Aircraft: Wings, All the panel and floors, cockpit and leading edges
Cobham (Midair refueling pods): 908 & 808 series
Boeing 777 Upper lock box: Landing gear and AH6i Vertical stabilizer
Boeing -Chinook CH47 : Tail and Crown
Sikorsky -S92 Cabins: All the Panels and final integration
- Calculation of standard Man-hours by using MOST study and submit the project for business development team
- Calculation of Manpower based on the standard hours and realization factor
- Method study and time measurement by using MTM-MOST and MTM-UAS analysis
- Preparation of Crew load charts and line balancing
- Capacity enhancement and calculation of peak production requirements (Man, Machine and material)
- Learning curve analysis and derive the best fit curve to the program
- Establish the baseline, tracking, monitoring and execution of the project
- Calculation of EWT for the different shipsets/aircrafts
- Calculation of VA & NVA man hours, preparation of action plan and monitoring.
- Preparation of performance , Productivity reports and presenting to Top management
- Working on lean activities to eliminate/reduce the observed wastes
Key projects/achievements
- Planning, scheduling, and execution of 85 ship sets of aircraft assemblies (Horizontal /Vertical Stabilizer & Leading edges) for C130 J Super Hercules of Lockheed Martin.
- Submitted the program schedule for 5 years contract timeline and got signoff &approval from the customer in first attempt (Lockheed Martin Head Office, USA)
- Planning, scheduling and execution of Dornier 228 NG -Ruag aircraft assemblies, Pilatus PC-12 assemblies, Cobham midair fuel refilling pods (series 908+808+905+912), Boeing 777 - Upper lock boxes (LH+RH), Ah6i - Vertical Stabilizer, Chinook - CH47 aircraft assemblies (crown and tail cone), AH64 Fuselage in the span of 4 years 5 months
- Implemented 5S culture and standardized IE reporting system
- Established barcode and andon system to escalate instant alerts to supporting functions during the work stoppages
- Standard time analysis by using MOST for Boeing 777 Upper Lock Box and improved the productivity Validated learning curve and saved the resources by 15%
2010
Dec
-
2011
Dec
Assistant Manager - Industrial Engineering
Skoda Auto India Limited / Aurangabad, MAHARASHTRA
- Responsible for the calculation of the standard time for the models /variants by using MTM-UAS study
◦ Skoda -Laura, Superb & Yeti
◦ Audi -A4 and A6
◦ VW- Vento and Passat
- Work guideline preparation and line balancing each technician/operator wise
- Calculation of VA & NVA, task/operation wise, station and plant.
- Working on lean manufacturing to reduce the NAV with the help of Spaghetti charts
- Performed the enhancements under KVP cascade along with the mother plant Skoda team
- Working on the expansion of Audi lines to increase the production from 6 to 10 cars
- calculation of productivity and reports generation
Key projects/achievements
- Saved 28 resources (manpower) by applying the MTM study in Skoda Aurangabad-for the variants Superb, Laura and Yeti.
- Improved the productivity of the Audi line by 22%
2009
May
-
2010
Dec
Senior Executive - Industrial Engineering
Fiat Auto India Limited
- Analyzed the standard timings using MTM-UAS system in paint shop by MTM-UAS for the models of
◦ Fiat- Punto, Linea, and TATA Manza
- Preparation of work guidelines and defining the total manpower required
- Preparation of HPV reports
- Optimized capacity through Lean principles and reduced variance between sites by global best practice sharing
- Acted as a Coordinator for World Class Manufacturing (WCM) paint shop for workplace organization pillar
Key projects/achievements
- Improved the utilization of resources in paint shop -FIAT auto India 40% by conducting the Line balancing and working on WCM-Workplace organization pillar
2007
Dec
-
2009
Apr
Graduate Engineer - Industrial Engineering
Mahindra & Mahindra Auto Limited
- Worked in bodybuilding shop & Assembly line for Savari, Bolero camper, Load king line as an Industrial engineer
- Responsible for calculation of standard time by using MOST (Maynard Operation Sequence Technique)
- Manpower planning and line balancing for all the different variants on the single line
- Calculation of Effective Working Time (EWT) and rebalance the lines once after stable
- Worked on value Added and Non-Value-Added analysis to improve the line utilization and productivity
Key projects/achievements
- Increased Productivity by line balancing with MTM standards & thus saved 15 resources from the line in Mahindra & Mahindra.
Education
2006
-
2008
Andhra University
ME -Master degree
- Completed Masters in Industrial Engineering stream with 1st class
2001
-
2005
Jawaharlal Nehru Technological University
B.Tech
- Graduation in Mechanical engineering-1st class