Khurram Waheed Bhatti

Khurram Waheed Bhatti

Procurement Engineer

Lahore, Pakistan
Message
Connect
Profile:

Summary

Results-driven as Procurement / Proposal Engineer successful at working alone or as part of team to achieve challenging targets working with multinational companies including Presson Descon International (Pvt) Limited and ABB (Pvt) Limited. Skilled in leading and directing team activities, coordinating projects and achieving goals with enterprising mindset. Bringing 12 years' experience and desiring challenging position with room for advancement. Have strong relationship with all EPC’s vendors in UAE/Pakistan and across the world.

Currently working as Procurement Lead in EPC oil & Gas division in Proposal department. (Pakistan & GCC region).

Experience

Present
Procurement Engineer
PDIL / Lahore

PROPOSAL ENGINEER (PROCUREMENT LEAD) (OIL & GAS PK-GCC Region) November 2016 to Current

Presson Descon International (Pvt) Limited (PDIL- EPC Division- A Descon Oil & Gas Company)

Leading procurement activities of EPC (O&G Division) in Proposal’s Department for GCC project’s material like Package equipment, Electrical equipment, Instrument and control items and Mechanical & Piping including engineered items. As Proposal’s Procurement Engineer, I am in close contact with ADNOC / GASCO approved vendors in UAE considering Descon ICV improvement plan.

Project’s Details as Procurement Lead:


ADNOC Group:

  • ADNOC DAS Island Service Substation Construction and replacement of PILC cables with XPLE at plant area.
  • ADNOC MP-21 Fire Protection Upgradation existing facility.
  • GASCO-Pipeline Surveillance & Upgradation of Telecom Network (SDH) and F&G System.
  • ADNOC Procurement & Construction of Flow lines & WH Package 1, 2, 3 & 4, UAE (LOI received for Package 1)
  • ADNOC Firewater Network Upgrade - Asab-0-UAE
  • Borouge Additional Bagging Line for PP1 & PP2 Plants project, UAE.

TAKREER EPC Works for Improvement of Mussafah Terminal Fire Fighting Facilities, UAE.

ADCO Replacement of OGD 0 & OGD II Ageing Network in Bab Field- UAE.

ADCO BUHASA Oil Gathering Network over Pressure Protection Project. UAE.

ADCO Rumaitha CO2 Expansion Project. UAE.

ADCO Rumaitha and Shanayal Restoration project. UAE.

ADNOC FERTIL- Fuel Gas Consumption and Zero gas discharge project. UAE.

ADCO Rumaitha CO2 Expansion Project. UAE.

ADCO Rumaitha and Shanayal Restoration project. UAE.

Borouge Company

Borouge ANTEO BBTPE Retrofit Project. UAE.

Pakistan’s Companies

  • PAPCO while oil pipeline (WOP) project. Pakistan.
  • Pak-Arab Refinery Limited (PARCO) MFM MoGas Project – Phase-II. (TS-3, Faisalabad and TS-4, Machike), Pakistan.
  • Pak-Arab Refinery Limited (PARCO) of MFM MOGAS Project (MFMMP) PHASE II, Kot Bahadur Shah. Pakistan.
  • National Refinery Limited (NRL) EPCC of Two Stage Distillation Unit - Revamp Project. Pakistan.
  • Attock Refinery Limited (ARL) EPCC of Two Stage Distillation Unit - Revamp Project. Pakistan.
  • Engro Polymer Utilities PVC III Plant. Pakistan.
  • Gambat South GPF-IV Upgrade Project (GPF-IV Project Phase-II)- Pakistan
  • Gambat South GPF-IV Upgrade Project (GPF-IV Project Phase-II)- Pakistan

Job’s Responsibilities:

  • Sent RFQ’s/MR’s to clients approved vendors to obtain at-least three competitive techno-commercial quotations.
  • Acquired technical compliance from engineering department at earliest.
  • Acquired competitive commercial offers from vendors after TBE (Technical Bid Evaluation).
  • Prepared comparison of each vendors commercially and present to management for review and approval for further proposal bid costing purpose.
  • Prepared Project Specific Vendor list for the approval of the client
  • Prepared procurement cost sheet comprising of landed cost at job site for each proposal separately.
  • Participated in Clarification and negotiation meetings during the Bidding phase of a project and ensure completeness of bids.
  • Prepared project risk register for each proposal regarding supply chain/procurement related issues.
  • Updated and arranged database of each proposal in order to ease our working.
  • Cost estimation for E&I and Piping Bulk for urgent bidding.

PROCUREMENT ENGINEER (EPC OIL & GAS) August 2012 to Oct 2016

Presson Descon International (Pvt) Limited (PDIL- EPC Division- A Descon Oil & Gas Company)

Managed all purchase activities of project material (Mechanical, Electrical, Instrumentation & Piping) including engineered package equipment, construction material including consumables, monitoring the activities for effective procurement of material as per project schedule by using SAP MM module. Oversaw logistics operation of the equipment, conversant with import & master list procedures in Pakistan. Providing estimation supports for bidding of new Projects.

As project buyer, I have close liaison with all national & multinational vendors as per approved vendor list provided by client’s ITB. Value added through expediting of deliveries through strong follow-ups with vendors, cost saving at-least 10-15% and vendor management through regular meetings.

Project’s handled:

  • MOL Pakistan, Makori GPF EPCC Project (2012-2014).USD 220M

Makori EPCC project having a capacity to process 150 MMSCFD gas, 20,000 bbl./day Oil, 10,000 bbl./day condensate and to recover 240 TPD LPG. Project scope includes oil condensate separation & stabilization, gas dehydration (Mol. sieve based), LPG recovery, Oil condensate and LPG storage/loading, sales gas compression & metering and associated utilities, wellheads, valve assemblies are also included in the EPCC scope.

Pakistan Petroleum Limited, ADHI LPG & NGL Recovery Plant III (2013-2015). USD 100M

Project includes basic and detailed design, engineering, procurement, construction & Commissioning (EPCC) of LPG & NGL recovery plant from Natural gas/Wellhead gas EPCC of ADHI LPG and NGL Recovery Plant III. Capacity: 30 MMSCFD Gas, 5500 BPD stabilized oil/condensate, 800 BPD produced water.

Pakistan Petroleum Limited, Gambat South GPF-II EPCC Project (2014-2017). USD 150M

Gambat South GPF-II natural gas processing project is being installed on EPCC basis by PDIL. GPF-II shall be designed to receive & process normal capacity of 50 MMSCFD raw gas, 1050 BPD condensate & 3000 BPD of free water. Gambat South Block located in District Sangarh, Tehsil Shahdadpur in Sind Province, Pakistan.

National Refinery Limited (2016-2017).

NRL intends to increase throughput of Fuel Refinery Crude Distillation Unit from 50,000 BPD to 53,000 BPD consisting of blend of 46,000 BPD of Arabian light crude and 7,000 BPD of condensate.

Mari Gas Petroleum. High pressure three phase separator. (2012-2013)

MOL Pakistan High pressure three phase separator. (2013-2014).

United Energy Pakistan Limited High pressure three phase separator. (2013).

Job’s Responsibilities:

  • All procurement activities starting from tendering stage through project commencement & execution to completion.
  • Undertook day-to-day management and control of the contracts and purchasing activities within an operations management project team including adherence to approved processes.
  • Leaded negotiations with contractors and suppliers in an international multi-cultural environment.
  • Coordinated with vendors for technical evaluation & acceptance of offers by Engineering
  • Finalized purchase orders and contracts within budgeted prices as per project schedule through SAP MM module.
  • Carried out all expediting activities for assigned purchase orders.
  • Monitored vendor progress including submission of vendor drawings and documents, placement of material orders, manufacturing, and preparations for delivery.
  • Ensured that any problems that may cause deviation from the technical specifications or project schedule are reported immediately.
  • Coordinated shipments, and monitoring delivery schedules and shipment processes.
  • Produced expediting reports and ensuring follow-up on action items.
  • Monitored and expedited resolution of over, short and damaged material reports related to purchased materials and equipment.
  • Developed and maintained strong & reliable supplier base in domestic, Asian & European regions
  • Cleared vendor’s invoices & facilitating release of payment as per the PO terms.
  • Managed Quality Management concepts and principles for Procurement under ISO 9000 Series
  • Worked with Project Procurement Manager to ensure all terms and conditions of vendor contracts are being adhered to.
  • Worked with Procurement Manager and vendors to resolve communication breakdowns or issues.
  • Maintained positive working relationships with various internal parties such as Project Managers, and the Procurement, Engineering, and Construction teams.
2007 Jan - 2012 Jul
Proposal Engineer
ABB Pvt Ltd / Lahore

The main responsibility as the Proposal Engineer was a skilled technical communicator, created a well written customer proposal based on a customer request for quote and/or a specification using the Process Automation (PA) quotation system. Main clients were from Oil and Gas and Petrochemical, sugar industries, cement plants and paper & board mills etc. I have participated and won tenders of ODGCL, SNGPL, PPL and other Govt. Semi Government sectors. Excellent experience of SAP SD module.

Job’s Responsibilities:

  • Created multiple Proposals/Quotations/Tenders in Process Automation division for ABB Motors European and Chinese origin, Drives, field Instrumentations, DCS through wizard, spares parts of DCS and other equipment on a daily basis, per customer’s request-for-quote (RFQ), specifications (formal and in-formal), one-lines etc.
  • Performed detailed specification reviews to identify and address issues such as customer requirements, features and accessories required for pricing program and lead-times.
  • Approved and negotiated pricing per established guidelines, competitive feedback, and customer/market knowledge.

3.Processed multiple orders to ABB’s feeder factories around the world like Italy, Singapore, UK, USA, and China on a daily basis through SAP modules.

4.Verified the order acknowledgment from ABB feeder’ factories technically and commercially for further go-head for production of equipment.

5.Expedited for delivery in time for ordered items / equipment.

6.Arranged required information to the risk review process in accordance with ABB policy and participates.

8.Provided product and application technical support for customers, agents, channel partners and internal departments.

9.Acted as a liaison between engineering, marketing, scheduling, finance and customers.

10.Participated in customer visits regularly to the Customer’s premises for technical and commercial clarifications and business development purpose.

11.Managed entire documentation related file / folder for each project as per company policy.

12.Performed lost proposal analysis, identifies potential cause and recommends future actions in cooperation with sales / local BU to obtain better future results.

13.Achieved yearly targets assigned by management.

14.Used SAP SD module for Sales order creation and further order processing to factories

Education

2002 - 2006
Dawood University of Engineering & Technology
B.E Electronic

Skills